Description
This publication provides introductory technical guidance for civil engineers, mechanical engineers, electrical engineers and other professional engineers, construction managers and power utility operators in sizing of hydroelectric power plants and integrating them into regional electric power systems. Here is what is discussed: 1. INTRODUCTION, 2. PROCEDURE FOR SIZING POWERPLANTS, 3. POWER SYSTEM REQUIREMENTS AND MARKETABILITY, CONSIDERATIONS, 4. PHYSICAL CONSTRAINTS, 5. ENVIRONMENTAL AND NON-POWER OPERATING CONSTRAINTS, 6. SELECTION OF ALTERNATIVE POWER INSTALLATIONS, 7. DEPENDABLE CAPACITY, 8. INTERMITTENT CAPACITY, 9. FLEXIBILITY, 10. MEASURES FOR FIRMING UP PEAKING CAPACITY, 11. HOURLY OPERATION STUDIES LangueenVersionBrochéDate de sortie initiale04 août 2018Nombre de pages82IllustrationsNon
Personnes impliquées
Auteur principal
J Paul Guyer
Editeur principal
Createspace Independent Publishing Platform
Informations sur le fabricant
Nom du fabricantLibri GmbHAdresse électronique du fabricant[email protected]Informations sur le fabricantLes autres informations du fabricant ne sont actuellement pas disponibles
Autres spécifications
Hauteur de l’emballage4 mmHauteur du produit4 mmLargeur d’emballage216 mmLargeur du produit216 mmLivre d‘étudeOuiLongueur d’emballage280 mmLongueur du produit280 mmPoids de l’emballage213 gPolice de caractères extra largeNon
EAN
EAN9781718045705
Sécurité des produits
Opérateur économique responsable dans l’UE
Afficher les données
Vous trouverez cet article :
Catégories
Technologie et architecture
Technologie de l’énergie
Électrotechnique
Livres
Livre, ebook ou livre audio ?
Livre
Disponibilité
Disponible à l’adresse suivante
Langue
Anglais
Type de livre
Paperback

Avis
Il n’y a pas encore d’avis.